Site Upgrade and Capacity Expansion

Project Overview
BPE have worked with GE Healthcare Cork Ireland since 2012, over that time we have delivered over €50 million in site and plant capital expansion projects.
In 2016 due to increase in market demand GE Healthcare required production to increase from 25 Million Units to 40 Million Units per annum. Doubling production in the current facility required the introduction of a new development facility, new terminal sterilisation capacity, New Compounding suite / High Volume Dispensary, CUB for PUW /WFI /Clean Steam / Clean Air, and Tie in’s to current production lines. This was a live Plant and required continuous production without disruption or downtime. There was also an 18 month schedule to meet supply chain demands.
“I can thoroughly recommend BPE Having delivered a number of our key strategic projects onsite for GE Healthcare including our recent capacity expansion and facility upgrade , BPE are our preferred engineering partners onsite. Consistently exceeding our expectations by not only providing project success but by acting as trusted advisors for our engineering and site leadership team”
Eugene Barrett, Site Director GE Healthcare
Download the Case Study by submitting your email address below:
Services
- Conceptual Design
- Front End Study
- Detail Design
- Multi Discipline Design
- Process Design
- Mechanical Piping Design
- Electrical & Instrumentation Design
- Estimate & Cost Control
- Procurement
- Contract / Vendor Management
- PSDP
- C&Q
- Design